Sprinkler design has a narrow window: late enough to follow the MEP set, early enough to clear the AHJ before mobilization. Engage us by W6 and the permit package lands ahead of mobilization.
Submittal and field-installation packages tied to your construction schedule. Coordinated with the MEP set from the first draft.
We design around existing conditions and flag conflicts before crews mobilize. Fewer surprises, fewer change orders.
Every package gets a code check against the current NFPA edition before it leaves us, coordinated to your MEP set and your AHJ's submittal format.
Lacuna, LLC · sprinkler design only
Submittals land on the date we set, coordinated with the rest of the trade stack. If anything threatens that date, you hear from us first.
You get a delivery date with the quote. We hold it. If a project changes, we tell you before the date slips.
We design against the latest mechanical, electrical, and structural backgrounds so conflicts show up on the drawing board, not in the field.
Packages arrive in the format your jurisdiction expects. Fewer review cycles, fewer corrections, faster permits.
Engage us directly or behind your fire protection sub. Either way you have a single point of contact on the design.
Scope, delivery date, and quote back inside 24 hours.