Sheet GC-102
General Contractors

Keep fire
protection off
the critical path.

Sprinkler design that lands when you need it, coordinated with your MEP set, and cleared by the AHJ the first time. We work behind your fire protection sub or directly with your team, so the schedule does not wait on the drawings.
Open RFQ ↓
01 / Critical-Path Schedule

Where sprinkler sits in the trade stack.

Sample · 12-week design phase

Sprinkler design has a narrow window: late enough to follow the MEP set, early enough to clear the AHJ before mobilization. Engage us by W6 and the permit package lands ahead of mobilization.

02 / ServicesSprinkler scope only · no fire alarm · no smoke control
01

New Construction Design

Submittal and field-installation packages tied to your construction schedule. Coordinated with the MEP set from the first draft.

AutoSPRINKRevit
02

Remodel & Retrofit Design

We design around existing conditions and flag conflicts before crews mobilize. Fewer surprises, fewer change orders.

AutoCADNavisworks
Coverage Plan · OH Group 2Scale 1/8" = 1'-0"
6'-0"12'-0"12'-0"6'-0"6'-0"12'-0"6'-0"N
Pendant Sprinkler · K-5.6 · 130 ft² coverage · 12'-6" max spacing per NFPA 13
03 / What You Get

A package the
AHJ approves,
not corrects.

Every package gets a code check against the current NFPA edition before it leaves us, coordinated to your MEP set and your AHJ's submittal format.

Lacuna, LLC · sprinkler design only

04 / How We Fit

Drawings on your
schedule, not ours.

Submittals land on the date we set, coordinated with the rest of the trade stack. If anything threatens that date, you hear from us first.

Sheet RFQ · 24H Turnaround

Send us
the set.

Scope, delivery date, and quote back inside 24 hours.

Direct · support@lacunafire.com
Phone · 405-237-8955
Files stay confidential. No obligation.